考试辅导

名师推荐

试听名师的课 查看所有名师

谈判英语一日通:(10)修改交货日期 发布时间:2010-06-24 18:42 来源:互联网

 Modify the Delivery Date
  A third bargaining chip is modifying the delivery date to allow more time for the manufacturer to produce the required units.
  第三个可以用来议价的筹码是修改交货日期,这给制造商更充裕的时间来制造你所订的数量.
  Mel:And that's the bottom line.Not too bad ,even if I do say so myself.
  这是最低价格了,我自己看都觉得很不错了.
  Bill:Well,to be honest,I was figuring on something about 10% lower.
  老实说,我还希望能再打9折.
  Mel:That's about what I'd normally charge,but you added these time restrictions and I'm going to have to pay some overtime to get it in under the wire.
  其实我平常就是那个价码,但因为你有时间限制,我得请工人加班,才能准时交货.
  Bill:So how much time do you need to lower the price?
  时间要往后延多久,我才能有折扣?
  Mel:Usually there isn't any time requirement.
  我通常都不压时间限制的.
  Bill:I know that,but I'm not going to do that.I want this finished quickly with no breaks in between,so the time limit stays.
  我知道,但我不想这样.我希望这批货尽快完成,完全没有延误,所以时间限制不能变.
  Mel:I won't do that to you.
  我不会害你开天窗的.
  Bill:Right,not with this penalty in the contract.
  没错,因为这次迟交会有罚款.
  Mel:Okay.Give me fifteen working days from start to finish and I'll lower the price 10%.
  好吧.开工后,给我15个工作日,我就再降个百分之十.
  Bill:How about ten days?
  10天如何?
  Mel:I need 12 or no deal.
  我要12天,否则免谈.
  Bill:Done!
  成交.
  Vocabulary 重要词汇
  bottom line总价底线
  restriction 限制
  under the wire顺利运作
  penalty罚款

第一考试网友情提示:如果您遇到任何疑问,请登录第一考试网考试辅导频道或添加qq:,第一考试网以“为考友服务”为宗旨,秉承“快乐学习,轻松考试!”的理念,旨在为广大考友打造一个良好、温馨的学习与交流平台,欢迎持续关注。以上是小编为大家推荐的《谈判英语一日通:(10)修改交货日期》相关信息。

编辑推荐

2011商务英语辅导:BEC高级高频词汇解析(4)

商务英语(BEC)怎么尽快通过(写作篇)

2011商务英语辅导:BEC高级高频词汇解析1

第一考试网推荐:权威商务英语系列讲座8

第一考试网推荐:权威商务英语系列讲座12